Bund Lining
Durable, secondary containment for tank terminal bunds and berms
Concrete Canvas® (CC) products are the ideal solution for secondary containment bund and berm lining, providing weed suppression and protection against weathering erosion, abrasion and damage from burrowing animals. CC products are rapidly installed, with a small logistical footprint, reducing time on site and disruption to operations. Our containment product, CC Hydro™ (CCH) can be laid directly onto existing profiles without loss of volume capacity and has excellent chemical resistance. Used by 9 out of 10 of the world’s largest Oil & Gas providers.
Useful Resources
Featured Videos
User Benefits
All-in-One Solution
Combines the impermeability of a containment liner with the hard armour protection and durability of concrete.
No Top Cover
Does not require a protective cover, avoiding excavation, contaminated arisings and costly fill.
Maintains Volume Capacity
Can be laid directly onto existing profiles without reducing volume capacity.
Reduced Life-Cycle Costs
Suppresses weeds, removes soil cover maintenance and lowers end-of-life treatment costs.
FAQs
Concrete Canvas® (CC) is the original Geosynthetic Cementitious Composite Mat (GCCM) and the first product to declare conformance to ASTM D8364 ‘Standard Specification for GCCMs’. It is a flexible, concrete filled geotextile that hardens on hydration to form a thin, durable and waterproof concrete layer. Essentially, it can be described as Concrete on a Roll® and is used for a wide variety of applications including the lining of secondary containment bunds to provide erosion control, weed suppression, protecting against animal damage and reducing maintenance.
- Sufficient CC to complete the project including allowance for edge fixings, overlaps
- Suitable lifting equipment to dispense CC Bulk, Batched or CC Wide Rolls
- Safety mask and gloves
- Cutting equipment, utility knife or disc cutter
- Metal or plastic fixing pins and lump hammer
- For jointing CC: Screwdriver, stainless steel screws and sealant or alternative approved method to join the CC layers. See the CC Equipment List for full details.
- For ordering, offloading and storage information, see the CC Logistics Guide for full details.
- Dust hazard. Wear appropriate PPE. Consult CC & CCH SDS
- Remove vegetation and grade the bund to a uniform profile to suit the design dimensions.
- Remove sharp or protruding rocks >25mm and fill large voids.