Containment / Bund Lining | Acacías-Meta, Colombia

Improving containment to reduce permeability and erosion

2250
of CCHT1 used to upgrade secondary containment bunds
20 Days
to install in adverse weather conditions
17 Bulk Rolls
used for remediation

Solution

To prevent the bunds from eroding and to reduce their permeability, a number of solutions were suggested. One solution was poured in-situ concrete. However, the solution would have required the facility to shut down part of its operations to allow for specialist equipment to come onto site and install. CC Hydro was chosen due to its ease of handling, safety during construction, its high impermeability and environmental durability. CC Hydro was also chosen because of its lower environmental impact (Global Warming Potential) when compared to poured in-situ concrete, complying with the client’s new environmental compliance policies to satisfy the regulatory requirements of the Colombian National Environmental authority.

Additional welding strips used at intersections
CHT1 cut to accomodate pipe penetrations

Design & Installation

  • Bunds graded and cleared of vegetation
  • CCHT1 Bulk Rolls delivered, stored and cut to length
  • Material placed by hand on bunds
  • Joints thermally welded and pressure tested
  • Secured in toe anchor trenches
  • Terminations to concrete fixed with stainless screws anchors and covered with concrete
  • Hydrated with bowser, rehydrated hourly and after 24hrs
Battons used to flatten joints after hydration

Summary

A total of 2,250m² of CCHT1 was installed in under 20 days despite very adverse weather conditions. Not only was the project delivered on time, even with delays caused by heavy rain fall, but the project was undertaken with locally sourced personnel, enabling the capital expenditure to remain largely within the area. Following the successful completion of this project, additional orders for CCHT2 and CCX-M® were issued to address other bunds and ditch lining installations on site.

Completed Installation
Completed Section

Reliable Bund Remediation with CC Hydro