Canal Lining | North Sterling, Colorado, USA

Erosion Control with CCX-M® in Colorado

164ft²
of CCX-M® installed to line overspill swale
2 Hours
installation time by NSID’s own crew
24 Hours
swale back in service after installation

Design & Installation

  • CCX-M® Bulk Rolls specified
  • Swale regraded prior to deployment
  • Transverse layup
  • Perimeter edges secured in anchor trenches
  • Range of joints demonstrated including screwed, screws & sealant and screws & thermal bond
  • Hydrated using a hose and water bowser
CCX-M® Hydrated using hose and water bowser

Summary

The speed of installation is also key; allowing irrigation districts to install within tight windows between irrigation seasons and to allow the swift return of canal assets to operation to minimize water supply disruption. 164ft² of CCX-M® were installed in less than two hours and the swale was back in service less than 24 hours later.

I thought CCX was a good solution for us, from the first time I saw the product. It was easy for our crew to install with simple tools, most of which we already owned. Cost, performance, the ability to self-perform and the speed and ease of installation are important factors for us. The CCX solution looks great and was quicker and easier to install than pouring concrete, which we would have probably had to contract out. I expect the CCX to perform very well and can see multiple uses for the district including cattle crossing and general erosion control and bank stabilization. I would have no hesitation in recommending CCX to other irrigation districts.

Jim Yahn, District Manager North Sterling Irrigation District

Cut Seepage, Save Water

Speak to an expert today about how CCX-M® can protect your canal