Channel Lining | Church Village Bypass, South Wales, UK

Sustainable Drainage Solution for Church Village Bypass

Drag
Before
After
240
of CC8 used to line drainage channel at the crest of a slope
120
years durability BBA Certified for erosion control
12
years after installation, CC8 still performing as expected
CC edges were captured in anchor trenches following installation
Anchor trenches were backfilled to prevent ingress

Design & Installation

  • CC8 Bulk Rolls specified
  • Vegetation removed and channel reprofiled
  • 3 Layer Longitudinal layup
  • Screwed Joints
  • Perimeter edges secured in anchor trenches
  • Hydrated using water bowser and hose
Termination of channel into stream
Completed installation
Completed installation

Summary

Berro volum que es eos sinto beaquiasim quidus pro mil illabor simi, totat et, ne la doluptium es atet, oditias re ma dolest aut audae natia era expella sum ut volor rerchil luptati onemoloreri que core cori ad quod quiat ea suntibus sus, voluptatur, siminve rferum qui abo. Nam et et am que est, cone dererum aut ut que et ullorepelis nes dolut quia voluptat experovid moloriam aliquis minulparum archill uptinctiunt labo. Itaeptatur sus.

The Church Village Bypass scheme presented our team with a unique challenge. The location and nature of the works required the sensitive use of appropriate construction materials in order to minimise the impact on the local environment. Concrete Canvas provided a means of rapidly installation a low carbon concrete ditch whilst maintaining the natural aesthetic of the overall scheme.

Daniel Powrie CEng MICE, Project Manager Costain Group

9 Years After Installation

Downstream view of the channel
Algae and moss growth established on the fibrous top surface of the CC material

Looking for a proven, maintenance-free channel lining