The Project

Set in Church Village, South Wales, a major construction project was underway. In the previous year, Costain had been appointed as the main contractor for a £90m Church Village Bypass Scheme. This involved the construction of two bridge roads, four roundabouts, three community footbridges, two cattle grids and one subway, along with the installation of holding ponds and a surface drainage network.

Costain wanted to use environmentally-friendly materials, such as recycled aggregates, to minimise the impact on the local ecology. Following approval from the Environmental Agency, Costain decided to use Concrete Canvas to line the drainage network.

Church Village Before

The Solution

At Concrete Canvas, we provide a range of Geosynthetic Cementitious Composite Mats (GCCMs) for channel lining projects. Depending on the project requirements, we can recommend a type of GCCM to suit the needs of the landscape and location. For this particular project, we suggested our CC8 GCCM be used as an environmentally conscious solution.

At the site, there was already a drainage channel in place. However, it had become overgrown with vegetation and was no longer suitable for use. Before the installation of CC8 could begin, the original channel was graded and all vegetation was removed, creating a smooth substrate. With the channel prepared, bulk rolls of CC8 material were delivered to site and lifted into position using a spreader beam. Using plant equipment made it easier for workers to manoeuvre the bulk rolls, and allowed them to simply pull the material into position.

Church VIllage Deployment
Church Village Backfill

The Results

A total of 240m² of CC8 was installed to complete the drainage network as part of the Church Village Bypass Scheme. By using Concrete Canvas, Costain were able to complete the scheme in a time-efficient and cost-effective manner, whilst having a minimal impact on the surrounding environment. After the completion of the project, we received the following feedback from Daniel Powrie, the Project Manager at Costain.

The Church Village Bypass scheme presented our team with a unique challenge. The location and nature of the works required the sensitive use of appropriate construction materials in order to minimise the impact on the local environment. Concrete Canvas provided a means of rapidly installing a low carbon concrete ditch whilst maintaining the natural aesthetic of the overall scheme.

Daniel Powrie, Project Manager Costain Group